1.1Buried the rail track
1.2 Please use the special clip and setscrew(normal M12*80)to fix the bottom bracing after putting the door into the orbit.
1.3 Limit switch: To put the device on the position of setting button.
1.4 Fix the control box: Install the control box in the hand piece or the room about 10meters away from the main engine.
1.5 Connection: Check the security of the lines and terminal on the base of outage of power and then connect the matching lines strictly abide by the connection chart.
2. Debugging
2.1 Before switching on the power,you'd better to check the working condition of the door to pushing and pulling the door by hand.
2.2 The power indicator can be turned on when switch on the power.When push down the
"open" button,the "open" indicator light can be bright,and then the door can be opened.
2.3 If find the operating limit is not accurate during the process of testing,please adjust the height of the limit switch.
2.4 It can be used when everything is normal after over 5 times testing and operation.
Stainless steel sliding gate door with automatic operator
Our Stainless steel sliding gate door with automatic operator is good in quality and competitive in price. We manufacture Stainless steel sliding gate door with automatic operator and supply OEM, ODM service according to your requirement.
If you want more detailed information of this product or related problems, please contact with us, we will reply as soon as possible (general in 24 hours).